Jan 27, 2010
|
TT-UK/TT Middle East presents Burstform
At the first Underground Infrastructure Middle East Conference held in Bahrain from 18 – 19 January, TT-UK/TT Middle East presented for the first time in the Region their NEW Burstform, Tight in Pipe Trenchless renewal pipe system. Burstform is a deformation unit, which deforms the circular high quality PE 100 pipe into an oval shape and allows the pipe to be pulled around two 90 degree bends from the surface into the manhole and from the manhole into the host pipe using the advanced QuickLock rod technology. Before the pipe enters the host pipe a reshaping mechanism forms the pipe back into a circular pipe. This process avoids the expensive pipe launching pit.

Daniel Toms, TT-UK/TTME, presenting the Burstform technical paper
The technical paper was presented by Daniel Toms to a receptive audience including high ranking officials from the Bahrain Ministry of Works and the Bahrain Society of Engineers. TT-UK/TT Middle East‘s sales partner, Abbas Biljeek, were also in attendance to assist with the varied Trenchless application exhibition enquiries generated during the course of the event. TT-UK/TTME takes this opportunity to thank the organisers EITEP for their great efforts in organising this inaugural event where 250 visitors from 13 nations were in attendance.

BURSTFORM Pipe deformation
Contact: www.tt-uk.co.uk
|