GRUNDOMAT-N. The royal league of soil displacement hammersGRUNDOMAT-N. The royal league of soil displacement hammers
nodig-construction.com

Facebook
Twitter
Newsletter
Why dig - when there are Nodig® solutions?

Ground cables

The topic world “Ground cables” deals with the installation of underground cables for power and telecommunication, backbone and city networks as well as house connections. A special focus is on the installation of ground cables using trenchless technologies.



News
Board
Books
Events
Methods
Videos
Addresses



Highspeed Trenchless Installation of Pipes and Cables in Open Terrains
29.01.2013 - Especially in rural areas open trench installation is needlessly laborious and often not cost effective. Since 1971, manufacturing company Frank Föckersperger GmbH from Aurachtal in Germany has offered a fundamental new development in installation me... [further information]

Frank Föckersperger - Plowing in the Desert
02.07.2012 - This many tons heavy special vehicles are developed and manufactured in Münchaurach (Germany). To buy such a system includes a training. Frank Föckersperger was a little bit proud, when he was watching the new cable plow working on the field and tol... [further information]

Crossing the Manchester ship canal
24.04.2012 - As part of a project to upgrade High Voltage power cables near Manchester, Electricity North West needed to run the new cable route under the Manchester Ship Canal between Carrington and Irlam. Investigations had shown that the only viable option for... [further information]

400 FTTH house connections with GRUNDOMAT hammers
17.04.2012 - That was the question asked of Michael Depau on a daily basis by one of the US liaison officers at the Kelly Barracks in Stuttgart, Germany. Michael was in charge of a cable installation project for several weeks. In 2009 Michael Depau became self-em... [further information]

Company Paasch installs cable through a nature reserve to a tide gauge
24.02.2012 - The tide gauge at Schleimünde is situated on the north side of the Schlei Estuary, approx 150 m along the coast side of the pilot island in the Baltic Sea. Energy supply and data transfer is carried out via 2 cables which run further from the gauge w... [further information]

Further news